Hi All

 

Not been on for a while so thought I should do an update.

 

We have had a name change from "Primoris" to "Superbricks", done a lot of cold calling and attended the Cambuild14 event on Diamond Island were we have received a fantastic response from local and international companies who currently import these products. Some of the larger companies are attending an open morning at our factory on Saturday and we are expecting large orders within the next 4 weeks.

 

We are currently looking at moving into wet casting and purchasing our own trucks within the next month. Within six months we should also be able to offer CLC light weight blocks.

 

I had breakfast last month with Dr Sok Siphana from ZICOlaw. Dr Sok Siphana is currently writing the Cambodian construction law and procedures. I unfortunately only had a chance to thumb through the first draft folder over breakfast but I can say it is very thorough and based on international standards. Dr Sok Siphana stated that the Ministry of Commerce would be responsible for inforcing the final draft document.

 

The above does show that things are changing in Cambodia, yes it may be another 5 or 10 years but differences can be seen.

Share this post


Link to post
Share on other sites
sidestep

Hi all

 

Just an update.

 

We have registered a new company in Phnom Penh called "Unipro Logistics and Construction Co Ltd". We will be selling International standard building materials and hardware under this company.

 

The Brick & Block prices advertised earlier have been reduced. The new prices and information can be seen at "www.uniprologistics.com".

 

The website is a work in progress and has a few errors but will improve with more products added over the next couple of weeks.

Edited by sidestep
  • Like 1

Share this post


Link to post
Share on other sites
Parrothead

Sounds even better for what I want. Now, what about your delivery truck availability? 

Share this post


Link to post
Share on other sites
sidestep

Unipro Logistics Co Ltd will be our sales front and along with the bricks & blocks we will be selling associated items such as ties, mesh and ladder reinforcement. You will also see quality tiling, plastering and bricklaying tools alongside Health & Safety equipment.

 

Our future plans currently include pre-stressed concrete and light weight blocks.

 

we are currently looking for a suitable showroom in Phnom Penh.

 

As for sales: our concrete blocks have been fire tested in Vietnam and we expect to be doing our first deliveries to Phnom Penh Airport after the water festival. We have another three major orders to be finalised by New Year.

Share this post


Link to post
Share on other sites
sidestep

Sounds even better for what I want. Now, what about your delivery truck availability? 

Hi Paul

 

We have the funds and I am currently half way through sourcing the best new truck deals we can get. I don't expect to have our own trucks before the first week in January.

 

I will be using local truck services until ours come on line and will probably still use them when necessary afterwards.

 

As for your needs I believe I can sort you out a good delivery price. I have a meeting at 10 am tomorrow morning with an owner driver I intend to hire. After this meeting I will PM you.

  • Like 1

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • If you would like to join to begin posting and become an active member, feel free to click on THIS LINK, to register. If you have any questions, feel free to post them in the Forum Operations / Issues forum. If you register, but then are unable to log in, please feel free to post concerns in the Having Problems Logging In? forum. We will address any and all questions, comments, or concerns, as quickly as possible. Welcome to the Living In Cambodia Forums! 

    Welcome to the forum!

  • Similar Content

    • Parrothead
      By Parrothead
      We have a 500 Liters capacity poly water tank, and a Mitsubishi WP-105Q5 automatic water pump. We want to continue to have constant pressurized water at the farm. So, we are trading in our 12vdc pump system, for a 230vac pump system. At the moment, we can not have a bore drilled, for several reasons. So, we are constructing a foundation to support this little project, for the foreseeable future. 
       
      Although, by the amounts of ingredients below, it should be done by the Khmer formula, I want it done by "Paul's" formula. C30 concrete is what it will be, after all is said and done - 1 part cement, 2 parts sand, 3 parts gravel. So, we should have some "left overs" after this is done, for other projects coming up.
       
      So far, we have the following:
      300 bricks @ 250 KHR / brick ----------------------------------------- $18.75 USD
      6 sacks of cement @ $4.50 USD per 50 kilogram sack -- $27.00 USD
      2 cubic meters of sand, at $12.50 USD / cubic meter ---- $25.00 USD
      2 cubic meters of gravel, at $12.50 USD / cubic meter --- $25.00 USD
      8.5 kg of reinforcement wire, at $1.00 USD / kilogram ----- $8.50 USD
      Sub-Total ----------------------------------------------------------------------- $104.25 USD
       
      Additional supplies: 
      2 sacks of cement @ $4.50 USD per 50 kilogram sack -- $9.00 USD 
      1 finishing trowel ------------------------------------------------------------ $ .63¢
      1 float, 2 meters long ------------------------------------------------------ $ 4.50
       
       
      We are going to pour a 3.2 meters long, by 1.5 meters wide, by 10 cm thick, concrete slab.
       
      -------------------------------
      Of course, photos will be added later.
       
      Here is my original thread, where I brought up strength of various foundation formulas.
       
       
    • Parrothead
      By Parrothead
      My father was a general contractor before he retired. But, for years during my life, and many years before, he was a masoonry contractor. As a boy, I learned - if I recall correctly, that mortar mix was 1 sack of mix, 15 shovels of sand, and about 5 gallons of water, in the mixing machine. I don't recall what it was for concrete, as that was usually delivered by truck, to his work sites. So, I am glad I finally - at the age of 50, am learning about the other mix he used on many of the job sites I worked as a boy.
       
      Anyway, while doing some research for my projected footings, I started learning a few things about concrete that I wanted to share with those of you who may not know.
       
      Concrete strength is rated in grades. C15, C25 and C30, for examples. The grade of the concrete is the concrete compression resistance after it has cured for a bit under a month. 28 days, actually. But, who is counting? 
       
      The table below will show the parts of cement, sand, and gravel to add, to make the various mixes above, and to achieve the strengths necessary for a given project.
       
      Cement  :  Sand  :  Gravel  :  Grade      1        :     2      :      3        :   C30 (very strong)      1        :     2      :      4        :   C25 (strong)      1        :     2      :      5        :   C15 (general purpose concrete)   For the money, I would just as soon use C30 for everything, than a lower strength mix. But, that's just me. I would rather make sure my concrete pour is going to be stronger than I need it, than possibly weaker. Pretty difficult to go back and pour it over, once the construction job has been completed.   The variable C is equal to the same number in Newtons, per square millimeter, or N/mm2. For the yanks in the classroom, who use the Imperial System of measurements, this would be Pounds per square inch, or PSI. So, C30 would be 30 N/mm2, or 3,059,000 Kilograms of force per square meter kgf/m2, or 4,351 PSI.    Pretty damned strong. A lot stronger than I thought it would be.     
    • Parrothead
      By Parrothead
      Lookin' at building a house - down the road anyway. But, for starters, we had to start filling in a pond and raise the land around it. (Previously, the land had been used for rice farming.) 
       
      The new pond is 12.3m x 10.6m x 4m. The "old" pond was 19m x 9m x 3m.
       
      Old pond:

       
      Now, it looks like this:

       
      The new pond looks like this:

       

       

       

       
      Ultimately, we will build a small house on top of where the "old" pond was. Will have to add more fill dirt first, though, due to massive settling expected. 
    • Parrothead
      By Parrothead
      So, Chan recently negotiated the price down to $60 USD / cubic meter of ready-mix concrete. (Hopefully, if we go that route, we will be able to negotiate further.) This was with a guy out near the farm, who is in charge of a project where they are running two - six cubic meter concrete trucks. But, I wanted a comparison, to see what the cost difference would be, by asking Chan to drop by a local place I learned about, here in town (Battambang). 
       
      The place here in town, wanted $78 USD / cubic meter, to deliver ready-mix out to the farm. A significant price difference, for sure. 
       
      HOWEVER, she also learned something else. Let me explain something, first. 
       
      If you haven't read, we recently filled in a pond at the farm, whilst digging another, to build up the land where we wanted to build a small home. The former pond we filled in, aka the future building site, was 3 meters deep. So, we would need to let that dirt settle for a while - I figured one rainy season should do it pretty well, before digging footings and pouring a foundation slab on top of all that. (The last thing I want is for a foundation to crack.) So, we would have to wait about a year in order to build on that land. (See other threads, below.)
       
      Now, back to HOWEVER. While Chan was at the concrete place here in town, she learned that they also pour preformed concrete pilings, driving in the ground, for $10 USD / meter. (Seems like a fair price to me?) Anyway, I am not certain of the dimensions of these pilings, yet. We will go there later today (It's well past 5am here now) and check them out. If we can get concrete pilings long enough - I figure 3 meters below the former bottom of the pond. So, they would need to be AT LEAST 6 meters long, if not a bit longer, for this idea to come to life. 
       
      That is, have this company take X number of piles out to the lot, drive them into the ground at 3 meters below the former pond, and we would have the beginnings of our foundation already in place. Even if we needed say, nine concrete piles driven into the ground, that would be (9 x 6) x $10 = $540 USD. Still $120 USD cheaper than 11 cubic meters of concrete, at $60 USD / cubic meter. 11 x $60 = $660 USD. And, that is NOT including labor OR rebar needed for the foundation. Not to mention, we wouldn't have to worry about forming up pilings, or looking after them for the first week by keeping it wet, etc., while they slowly cure / dry to gain full rated strength. All that was already sorted when they are manufactured.
       
      Anyway, just something we are thinking about, as an alternative to going with ready-mix concrete. 
       
      Associated threads: 
       
      Filled in one pond and dug a new one today
       